Scan a QR code. See the exact drawing viewport, device status, and submittal for the room you're standing in. Log it. The daily report writes itself.
Book a Demo
You're flipping through plan sets, digging through email, and chasing foremen at end of shift. Meanwhile you owe the GC a complete daily report before you leave.
Every foreman, super, and PM is dealing with the same problem: critical information is buried inside static drawings. Which receptacle ties to which circuit? What did Crew 3 log on Level 4 six hours ago? Where's the submittal the inspector just asked for?
That's not a people problem. That's a tool problem. And it's costing you time, accuracy, and protection when disputes arise.
"If it's not documented, it didn't happen. Not to your GC, not to the owner, not in arbitration."
20+ years of construction field experience behind TradePlane
Whether you're running crews in the field or tracking costs from the office, TradePlane gives everyone the visibility they need from the same set of drawings.
You're managing multiple crews across multiple floors, tracking device installations, and logging daily activities. You still owe the GC a complete report by end of shift. TradePlane was built for exactly this.
Every crew log ties directly to the drawing — the exact location, device, and crew that did the work. Daily report compiles automatically. Submittals are one tap away.
Every receptacle and device linked to its circuit, panel, and endpoint instantly.
Field logs compile into a GC-ready report before end of shift, automatically.
Pull any submittal directly from the drawing. No binder, no email hunt.
Built for field use. Log, tag, and access drawings on any phone or tablet on site.
You're coordinating multiple trade contractors and expecting daily reports that are complete and on time. You're monitoring progress across a job site you can't always be standing on. TradePlane gives you that visibility from the drawings.
Every sub's daily log feeds into a unified project view tied to the drawings. No more chasing incomplete reports or reconciling what three subs claim happened on Level 6 yesterday.
See what every trade logged on the drawing, without making a single phone call.
All sub reports in one place, on time, every day. No gaps, no chasing.
Activity tied to exact drawing locations, not a generic paragraph in a PDF.
Every activity logged in real time. A defensible record for disputes and inspections.
You're investing in a project and relying on field reports and submittals to tell you what's happening. Those reports are only as accurate as what the foreman wrote at 5pm after a 10-hour shift. TradePlane closes that gap.
Real-time activity tied to drawings. After closeout, TradePlane becomes your building's interactive as-built record for the facility team, not a box of binders nobody opens.
Know what crews installed today, where, and which inspection checkpoints are cleared.
A complete, defensible paper trail for disputes, inspections, and closeout.
Every device, system, and drawing stays connected for your facility team after handoff.
Every piece of equipment has its submittal package tied to it, before the inspector asks.
When construction ends, the building's knowledge usually walks off the job with the last foreman. You inherit a box of binders and a PDF set with no idea what's connected to what. TradePlane hands you a live map instead.
Every device, circuit, panel, and system tied to the drawing you can actually navigate. Maintenance becomes a drawing interaction, not a document treasure hunt.
Tap any device on the as-built to see its panel, circuit, spec section, and submittal.
Who installed what, when, and what inspection was completed at every location.
Trace any device back to its source without calling the trade contractor who built it.
A real O&M manual tied to drawings, not a binder that nobody opens.
TradePlane was built around the drawings your crews are already using, not another system they have to learn from scratch.
A physical QR sticker on the wall routes to the exact drawing viewport for that room. No app navigation. No login maze. One scan, right detail, instantly.
Log install progress, check device-to-panel traceability, pull submittals for any device. Everything tied to the exact location on the drawing, in real time.
Every crew log, every activity, every note compiles automatically into a clean, GC-ready daily report. Send it before you leave the site, every single day.
A small number of specialty contractors are working directly with us to build TradePlane. Design partners get more than access — they get a seat at the table while the platform is still being shaped.
You work directly with the people building TradePlane. Questions get answered fast. Issues don't sit in a queue.
Your workflows, your pain points, your field feedback shapes what gets built next. Not a survey — a conversation.
We come to your site, configure it with your drawings and crews, and stay until it's running the way you need it to.
Design partners hold their rate as TradePlane scales. You don't pay more when more contractors come on.
New capabilities ship to design partners first — before general availability, and often built around your input.
You helped build this. That's visible when it matters — to your peers, your GCs, and the broader industry.